Monthly Diary

Show All Records
Date Title Category Points Actions
Oct 14, 2025 POINTS Genaral
  • Submitted complete MVAC design package to client and consultant.
  • Attended design review meeting and addressed comments.
  • Issued revision set of drawings and energy calculation summary.
  • Received provisional approval for tender documentation.
Oct 14, 2025 POINTS Genaral
  • Completed final drawings: fire alarm layouts, sprinkler riser, pump room GA.
  • Prepared system schematics, legends, and general notes.
  • Drafted material submittal list and BOQ summary.
  • Checked compliance matrix against code clauses.
Aug 25, 2025 POINTS Genaral
  • Drafted a proposal for the client regarding the supply and installation of exhaust fans in Hydraulic Power Unit (HPU) rooms, identifying a scope gap not covered in the original contract.
Aug 23, 2025 POINTS AGM Manager App
  • Developed the main Project Creation and Editing module (agm_projects), implementing a multi-step form.
  • Integrated the Google Maps JavaScript API for geographic coordinate selection and mapping.
  • Built the primary project listing page with search, filter, and sort functionality.
  • Implemented the project status change logic with automated history tracking (project_status_history).