Monthly Diary

Show All Records
Date Title Category Points Actions
Aug 25, 2025 POINTS Genaral
  • Reviewed FP8 Inert Gas system design per NFPA 2001
  • Shared MVAC, Electrical, and Plumbing drawings with FP8 contractor to facilitate coordinated installation
Aug 24, 2025 POINTS Genaral
  • Reviewed CIDA Fire Code (Sections 7.11–7.14) for hydrant and hose reel systems, including dry/wet risers, hydrant spacing, and hose reel coverage.