Oct 14, 2025 POINTS Genaral
  • Conducted energy analysis using load profile data.
  • Applied energy-saving features – VFDs, EC fans, heat recovery units.
  • Evaluated thermal insulation levels and fresh-air economizer control.
  • Ensured design compliance with ASHRAE 90.1 minimum efficiency standards.
Oct 14, 2025 POINTS Genaral
  • Reviewed architectural fire zones and fire barrier walls.
  • Designed fire-rated doors and partition details (2-hour ratings).
  • Prepared penetration seal schedule for HVAC, electrical, and plumbing services.
  • Added fire-stopping notes and UL/FM system references on drawings.
Aug 25, 2025 POINTS FIRE BLOCK 4
  • Continued the document audit for the Block 4 financial claim, focusing on electronic components installed in Block 4.
  • Prepared and circulated a Draft Taking Over Certificate for Part of the Works for Block 04 to the client for review.
Aug 25, 2025 POINTS Genaral
  • Conducted a site inspection following a client notification and documented corrosion issues on installed Boom Barriers, highlighting concerns for long-term durability.
  • Identified a critical material deviation during a site audit: Bollard roadway plates were found to be galvanized steel instead of the specified stainless steel (SS). Initiated a formal request for investigation and clarification from the contractor and OEM.