Monthly Diary

Show All Records
Date Title Category Points Actions
Aug 25, 2025 POINTS Genaral
  • Managed correspondence between FP8 contractor and client, ensuring smooth coordination
Aug 24, 2025 POINTS Genaral
  • Prepared and issued revised drawings for Zones 14 and 17
  • Studied CIDA maintenance and testing requirements for fire safety systems