Monthly Diary

Show All Records
Date Title Category Points Actions
Oct 14, 2025 POINTS Genaral
  • Defined points list for chillers, pumps, AHUs, and FCUs.
  • Designed BMS architecture with field controllers and BACnet protocol.
  • Created wiring schematics for sensors and actuators.
  • Developed sequence of operation for chillers and AHUs.
  • Coordinated FA & MVAC system interlocks for fire events.
Oct 14, 2025 POINTS Genaral
  • Designed jet-fan based smoke extraction system for LL1–LL3.
  • Established make-up air paths and fire mode override logic.
  • Sized stair pressurization fans and relief dampers.
  • Verified door opening forces < 133 N under pressure differential.
  • Integrated controls with fire alarm interface.
Aug 25, 2025 POINTS FIRE BLOCK 4
  • Initiated a detailed audit of the Block 4 contractor's Exchange Rate Fluctuation Claim for items used exclusively in Block 4.
  • Created a checklist identifying missing documents for the Block 4 claim and communicated these to the contractor.
Aug 25, 2025 POINTS Genaral
  • Assisted in conducting paint coating thickness tests on rectified Tyre Killer top plates; identified non-conformance with OEM specifications and raised a formal non-conformance report (NCR) to the contractor.
  • Participated in the review and filing process for the extended Performance Guarantee document, ensuring its validity aligned with the contract's defect liability period.