Monthly Diary

Show All Records
Date Title Category Points Actions
Oct 14, 2025 POINTS Genaral
  • Designed basement ventilation and car-park CO exhaust systems.
  • Calculated air change rates per CIDA and ASHRAE standards.
  • Designed smoke-exhaust and pressurization systems for stairs and lift shafts.
  • Integrated fire mode override control logic with BMS interface.
Oct 14, 2025 POINTS Genaral
  • Determined hose reel coverage for each floor (< 36 m reach).
  • Designed hose reel branches off hydrant mains with pressure regulators.
  • Planned fire extinguisher distribution and classification (A, B, C, E fires).
  • Cross-checked signage and mounting locations per CIDA Code.
Aug 26, 2025 POINTS Genaral
  • Studied fire alarm audibility requirements according to CIDA fire safety standards, ensuring alarm sounders provide a minimum of 65 dB throughout the building and at least 5 dB above ambient noise levels to maintain clear audibility