Monthly Diary

Show All Records
Date Title Category Points Actions
Oct 14, 2025 POINTS Genaral
  • Performed friction-loss and pump head calculations.
  • Balanced air flows for each duct branch and damper setting.
  • Optimized valve pressure drops and coil ΔP.
  • Compiled balancing schedule for commissioning.
Aug 25, 2025 POINTS Genaral
  • Monitored the progression and approval of Variation Order (VO-EE/01) for the damaged boom barrier replacement.
  • Issued a second reminder for the critical Bollard plate material deviation, noting the onset of corrosion on the incorrectly supplied galvanized plates.
Aug 23, 2025 POINTS AGM Manager App
  • Established the project repository and configured the local development environment.
  • Wrote and executed all database migrations to create the core table structure.
  • Developed the foundational PHP application with better structure.
  • Implemented a robust user authentication system (login, logout, session management).
  • Built the core access control logic based on agm_id and user permissions.