Aug 24, 2025 POINTS Genaral
  • Assisted in creating coordinated Revit models for building services such as fire lines, HVAC ducts, and plumbing systems
  • prepared and issued final coordination drawings for Block 2 (2nd to 6th Floors), updating all cable trays.
  • Finalized coordination drawings for Block 2 1st Floor with updated cable trays.
  • Studied CIDA requirements for automatic sprinkler systems, covering design density (5 mm/min for ordinary hazards), area of operation, water supply duration, approved pipework materials, and pump capacity, in accordance with CIDA Fire Code Sections 7.2–7.6.