Aug 25, 2025 POINTS Genaral
  • (FP8) Formally instructed the contractor to recommence site work following the extended suspension due to delays in interrelated contracts.
  • (FP8) Requested the contractor to submit a revised project program detailing the plan for completing all outstanding work.
  • (FP8) (Key Learning) Assisted in implementing COVID-19 safety protocols on site, collecting and submitting health declaration checklists for all of the contractor's personnel before granting site access.
Aug 24, 2025 POINTS Genaral
  • Studied passive fire protection measures such as fire-rated walls, doors, dampers, and escape routes, ensuring structural integrity, clear signage, and safe evacuation paths.