Date Title Category Points Actions
Aug 25, 2025 POINTS Genaral
  • (FP8) Approved the contractor's proposed cost and instructed them to proceed with the supply and installation of expansion pressure tanks for the hydrant and sprinkler systems (initiating another Variation Order).
Aug 24, 2025 POINTS Genaral
  • Studied emergency staircase requirements, including 2-hour fire-rated enclosures, smoke ventilation, pressurized firefighting shafts, photoluminescent signage, and emergency lighting with backup, in compliance with CIDA Fire Code Sections 5.7–5.11