Oct 14, 2025 POINTS Genaral
  • Drafted commissioning procedures for AHUs, FCUs, and chilled-water system.
  • Finalized testing sequence and instrument calibration checklist.
  • Coordinated TAB (Testing, Adjusting & Balancing) plan with contractor.
  • Established acceptance criteria for performance testing.
Oct 14, 2025 POINTS Genaral
  • Visited site to verify pipe routing and ceiling clearances.
  • Checked installation of landing valves and sprinkler drops.
  • Observed pump foundation and alignment preparation.
  • Provided feedback on installation quality and code compliance.
Aug 25, 2025 POINTS Genaral
  • Documented the formal approval of the Extension of Time, extending the project completion date to 29th August 2025.
  • Continued to pursue the long-standing Bollard plate non-conformance, seeking formal OEM confirmation on warranty and certification implications for a potential locally fabricated stainless steel replacement.
Aug 23, 2025 POINTS AGM Manager App
  • Developed the project financial records module for invoicing and receipts (project_financial_records)
  • Built the monthly financial input form for AGM managers (agm_monthly_financials).
  • Began engineering the backend algorithms for calculating Key Performance Indicators (KPIs).
  • Started development of data visualization components for the reporting dashboard.
Aug 23, 2025 POINTS MVAC BLOCK 4
  • Observed the use of a BACnet scanner tool to try and identify missing points on the network.