Monthly Diary

Show All Records
Date Title Category Points Actions
Aug 25, 2025 POINTS FIRE BLOCK 4
  • Assisted in the review and forwarding of extended insurance documents (Professional Indemnity and Workmen’s Compensation) from the contractor to the client for secure storage as per contract requirements.
  • Coordinated with the ceiling panel contractor to obtain clearance for above-ceiling MEP installations on the 6th-floor VIP areas.
Aug 25, 2025 POINTS Genaral
  • Completed final coordination drawings for Block 2 (1st to 5th Floors), updating record rooms.