Monthly Diary

Show All Records
Date Title Category Points Actions
Aug 23, 2025 POINTS Genaral
  • Issued drawings 018a, and 018b (Zone 17).
  • Designed a service duct detail at the retaining wall for external service coordination
  • Prepared the engineer's estimate for the watermain contract