Monthly Diary

Show All Records
Date Title Category Points Actions
Aug 25, 2025 POINTS FIRE BLOCK 4
  • Reviewed and verified the accepted Performance Guarantee and Advance Payment Guarantee submitted by the contractor.
  • Documented guarantee details (bank, value, validity) and forwarded the original documents to the client for safekeeping.
Jul 5, 2025 POINTS MVAC BLOCK 4
  • Developed and issued full coordination drawings for Block 1, 4th Floor.
  • Reviewed Contractor’s work program and look-ahead schedule
  • Tracked submission of CVs for key staff
  • Coordinated site office setup for MVAC works
  • Understood procurement processes for insurance policies (Professional Indemnity, Workmen Compensation).
  • Assisted in reviewing 5th-floor shop drawings and load calculations.