Monthly Diary

Show All Records
Date Title Category Points Actions
Aug 25, 2025 POINTS Genaral
  • Facilitated communication between the client and contractor regarding an invitation to witness factory tests of fire suppression equipment in Switzerland.
Aug 25, 2025 POINTS Genaral
  • Issued Block 2 LL2 final coordination drawings with AHU3/AHU4 area coordination.
  • Prepared final coordination drawings for Block 4 LL3 with AHU updates.
  • Prepared final coordination drawings for Block 1 LL2 with updated cable trays.