Oct 14, 2025 POINTS Genaral
  • Designed supply, return, and exhaust duct networks.
  • Applied equal-friction method for sizing; limited velocity < 8 m/s.
  • Completed pressure-loss calculations and balancing diagram.
  • Coordinated duct routing with structural beams and ceiling grids.
  • Prepared draft duct layout plans for all floors.
Oct 14, 2025 POINTS Genaral
  • Designed sprinkler layout for each floor per hazard class.
  • Selected head types (upright/pendent/concealed) & K-factors.
  • Defined floor control valve assemblies with test and drain valves.
  • Conducted initial hydraulic calculation for most remote area.
  • Coordinated pipe routing with ceiling grid and ductwork.
Aug 25, 2025 POINTS Genaral
  • Assisted in assessing a contractor's request for a further Extension of Time. Noted reasons including unforeseen ground conditions, import restrictions, and technical issues with installations.
  • Recommended an EoT until May 2024, noting the contractor's intention to claim additional costs.