Aug 25, 2025 POINTS Genaral
  • Issued the approved Variation Order (VO-FP&FD/B4/02) to the contractor following client approval.
  • Drafted a technical instruction mandating air pressure tests for sprinkler systems prior to water tests to prevent damage to newly installed gypsum ceilings.
Aug 25, 2025 POINTS Genaral
  • Completed final coordination drawings for Block 4 LL3, adding exhaust duct.
  • Prepared final coordination drawings for Block 2 LL3 (AC, fire, and plumbing modifications) and Block 3 LL3 (ceiling updates and exhaust duct additions).
  • Prepared final coordination drawings for Block 2 (4th and 5th Floors), including VIP ceiling updates and new pipes.