Oct 14, 2025 POINTS Genaral
  • Completed floor-wise ducting and piping drawings.
  • Added access panels and drain points.
  • Finalized AHU room and chiller plant layouts.
  • Integrated smoke extraction and fresh-air ducts with ceiling zones.
  • Prepared schematic diagrams and legends.
Oct 14, 2025 POINTS Genaral
  • Completed detailed hydraulic calculations for sprinkler remote area and hydrant riser.
  • Verified pump head losses and pipe friction values.
  • Conducted pressure drop simulation for highest floor landing valve.
  • Documented results and validated against minimum residual pressure criteria.
Aug 25, 2025 POINTS Genaral
  • Followed up on outstanding non-conformance reports (NCRs) for both the Boom Barrier corrosion and the Bollard plate material deviation.
  • Documented further corrosion observed at the base of Boom Barrier shaft assemblies, escalating the issue for urgent rectification.
  • Assisted in assessing a variation request for the replacement of a boom barrier damaged in a site accident, including liaison with the insurance process.
Aug 23, 2025 POINTS Genaral
  • Conducted initial stakeholder meetings to gather and finalize comprehensive software requirements.
  • Performed a detailed analysis of the existing legacy data structure and workflows.
  • Researched and selected the appropriate technology stack for the project (Laravel, MySQL).
  • Designed the initial high-level database schema and application architecture.
  • Prepared wireframes and mockups for core application flows.