Monthly Diary

Show All Records
Date Title Category Points Actions
Aug 23, 2025 Points Genaral
  • Issued Zone 14 coordination drawing
  • Studied the bidding document for the external watermain contract
  • Participated in 4th floor coordination drawings for Block 6.
  • The Block 6 total sprinkler-protected floor area : 41,598m2