Monthly Diary

Show All Records
Date Title Category Points Actions
Aug 25, 2025 POINTS Genaral
  • Handled DIMO’s Advance Payment Guarantee and first IPC for FP Block 8 mobilization
  • Reviewed and submitted contractor’s Workmen’s Compensation Insurance for FP Block 8 to client
Aug 23, 2025 POINTS Genaral
  • Assisted in issuing Zone 26 external trenches drawing
  • Supported preparation of EOT claim for MVAC contract, Block 07
  • Studied ANSI/HI 14.6 standard for centrifugal pump testing to guide equipment validation.