Monthly Diary

Show All Records
Date Title Category Points Actions
Aug 25, 2025 POINTS Genaral
  • Reviewed FP8 contractor EOT claim; recommended 3-month extension for labour and material delays
Aug 23, 2025 POINTS Genaral
  • Directed to produce coordination drawings for external FP service trenches.
  • Developed an advanced Excel tool for delay analysis of Block 07
  • Inspected FP system on-site, verifying corrective actions were completed.