Aug 25, 2025 POINTS FIRE BLOCK 4
  • Contributed to Revit modeling of building services, covering fire lines, HVAC ducts, plumbing systems, and related disciplines.
  • Assisted the senior engineer in the review and approval process for shop drawings related to the Fire Detection System for multiple floors (6F, 5F, 4F, LL2).
  • Distributed approved shop drawings to the relevant parties (client, contractor, site team).
Aug 25, 2025 POINTS Genaral
  • Prepared Block 2 LL2, GF, and LL1 final coordination drawings, including added floor trunking, AHU clash checks, and FP/AC modifications.
  • Completed final coordination drawings for Block 1 (2nd, 3rd, and 4th Floors) with revised pipe levels.