Oct 14, 2025 POINTS Genaral
  • Sized chillers, cooling towers, pumps, and AHUs based on peak load data.
  • Selected FCUs and VAV boxes for floor-wise distribution.
  • Calculated coil capacities and air flow rates.
  • Checked ESP losses for main ducts – optimized fan static pressure.
  • Created equipment schedule and data sheets.
Oct 14, 2025 POINTS Genaral
  • Finalized hydrant riser locations in firefighting shafts and external hydrant points.
  • Verified accessibility for fire vehicles and hose coverage.
  • Calculated required residual pressure ≥ 4.5 bar at landing valves.
  • Designed breeching inlets, hose boxes, and landing valve assemblies.
  • Coordinated hydrant line routing with civil and structural drawings.
Aug 25, 2025 POINTS Genaral
  • Evaluated a significant price escalation claim (LKR 49.7 Million) for bollards due to exchange rate fluctuations, following new MOD directives. Learned to verify quantities against order confirmations.
  • Reviewed and approved the method statements for bollard installation and tyre killer corrosion rectification (subject to coating thickness verification).