Aug 25, 2025 POINTS FIRE BLOCK 4
  • Prepared and submitted five sets of the final Contract Document to the client for execution.
  • Identified and communicated deficiencies in the initially submitted Performance Guarantee to the contractor, requesting a corrected version.
Aug 25, 2025 POINTS Genaral
  • Completed the coordination drawings for Block 1 Lower Level 1.
  • Studied CIDA requirements for special fire suppression systems, including clean agent systems for server rooms, CO₂ systems for flammable liquid hazards, foam systems for fuel storage, and water mist systems for heritage and marine applications, in accordance with CIDA Fire Code Sections 7.7–7.10 and relevant standards (ISO 14520, ISO 6183, EN 13565, NFPA 750).