Oct 14, 2025 POINTS Genaral
  • Issued IFC drawings to site team after final approval.
  • Conducted multi-discipline coordination review with FP and Electrical.
  • Developed inspection checklists for duct fabrication and pipe pressure tests.
  • Set QA/QC benchmarks for installation phase.
Oct 14, 2025 POINTS Genaral
  • Issued IFC drawings to site teams after authority approval.
  • Conducted coordination meetings with HVAC and electrical disciplines.
  • Finalized site inspection checklists and testing procedures.
  • Established document control system for as-built records.
Oct 14, 2025 POINTS Genaral
  • Submitted design drawings and technical data to the Fire Service Department.
  • Responded to authority comments and issued revisions.
  • Attended fire officer review meetings with architect and MEP team.
  • Secured preliminary approval for fire protection system layout.
Aug 23, 2025 POINTS AGM Manager App
  • Finalizing the KPI calculation engine to populate the agm_calculated_data table.
  • Optimizing database queries for improved performance on large datasets.
  • Conducting preliminary internal testing on completed modules.
  • Preparing for the development of the internal collaboration features in the next phase.