Technical Proposal: Make-Up Water System for Cooling Towers

1. Executive Summary

This proposal outlines the design and implementation of a make-up water system for cooling towers at [Facility Name/Location]. The system will ensure optimal water quality and quantity to maintain cooling tower efficiency while minimizing water consumption and treatment costs.

2. System Requirements

Key Parameters to Specify:

3. System Design

3.1 Water Source Selection

3.2 Treatment System Components

Component Purpose Design Considerations
Filtration System Remove suspended solids Multi-media filters, cartridge filters, or membrane filtration based on water quality
Softening System Reduce hardness Ion exchange or chemical softening, capacity based on hardness levels
Chemical Injection Scale/corrosion control Dosing pumps for scale inhibitors, biocides, pH adjusters
Reverse Osmosis For high TDS water Required when cycles of concentration demand very low make-up water TDS
Storage Tanks Buffer capacity Minimum 24 hours of make-up water demand

3.3 Piping and Instrumentation

4. Water Balance Calculations

Key Equations:

Evaporation Loss (E): E = Q × ΔT × 0.00085 (for °F) or E = Q × ΔT × 0.00153 (for °C)

Blowdown (B): B = E/(C-1), where C = cycles of concentration

Make-up Water (M): M = E + B + D (where D = drift loss)

Cycles of Concentration: C = Make-up TDS / Blowdown TDS

5. Water Conservation Features

6. Monitoring and Control

7. Materials and Equipment Specifications

7.1 Major Equipment List

7.2 Material Specifications

8. Implementation Plan

  1. Phase 1: Detailed engineering and design (4 weeks)
  2. Phase 2: Equipment procurement (8 weeks)
  3. Phase 3: Installation and commissioning (6 weeks)
  4. Phase 4: Performance testing and optimization (2 weeks)
  5. Phase 5: Operator training and handover (1 week)

9. Budget Estimate

Item Quantity Unit Cost Total Cost
Filtration System 1 [X] [X]
Softening System 1 [X] [X]
Chemical Dosing System 3 [X] [X]
Storage Tanks 2 [X] [X]
Piping and Valves 1 lot [X] [X]
Total [Total Amount]

10. Appendices